elkay water fountain installation manual
Elkay Water Fountain Installation: A Comprehensive Guide
Navigating Elkay fountain setups requires careful attention to installation manuals, ensuring correct assembly and adherence to local codes for safe, reliable hydration solutions․
Proper installation, detailed in provided instructions, guarantees optimal performance and longevity of your Elkay fountain, benefiting users for years to come․
Understanding Elkay Water Fountain Models
Elkay offers a diverse range of water fountain models, each with unique installation considerations detailed in their respective installation manuals․ From traditional, bi-level fountains to the modern ezH2O bottle filling stations, understanding the specific model is crucial․
Traditional fountains often involve basin shroud assembly and require careful attention to plumbing code compliance․ ezH2O models, however, necessitate specific procedures for installing the lower water cooler and connecting bottle filler components․
The installation manual will outline the specific parts list for your model, ensuring you have everything needed before beginning․ It will also detail any unique features, like filtered water options, and provide guidance on electrical connections if applicable․
Furthermore, newer models prioritize hygienic, touchless operation, impacting installation steps․ Always refer to the manual corresponding to your exact Elkay model number for accurate and safe installation procedures․ Ignoring this can lead to improper function or void warranties․
Pre-Installation Considerations
Before commencing Elkay fountain installation, thoroughly review the corresponding installation manual․ Assess the chosen location for adequate space, considering access for maintenance and filter replacements․ Verify the proximity of existing water supply lines and electrical outlets (if required) to minimize plumbing and wiring extensions․
Crucially, confirm compliance with local plumbing, electrical, and building codes․ This includes verifying water pressure and ensuring appropriate drainage․ Check for potential obstructions behind the wall where the fountain will be mounted․
Plan for the safe handling of the fountain components, as some units can be heavy․ Ensure the mounting surface is structurally sound and capable of supporting the fountain’s weight when filled with water․
Finally, gather all necessary tools and materials as outlined in the manual to streamline the installation process and prevent delays․ Careful pre-planning significantly reduces installation complications․
Tools and Materials Required

Successful Elkay fountain installation demands specific tools and materials․ Essential tools include a screwdriver set (Phillips and flathead), adjustable wrench, pipe wrench, level, drill with appropriate bits, and potentially a hole saw depending on plumbing access․ A voltage tester is crucial for electrical connections․
Materials needed typically encompass plumbing supplies like flexible water connectors, Teflon tape, and pipe dope․ Electrical wiring, conduit, and connectors are required for models with electrical components․
Additionally, you’ll need mounting hardware (screws, anchors), a bucket for water spillage, and cleaning supplies․ Depending on the model, specific Elkay-provided components like basin shrouds or bottle filler parts will be necessary․
Always consult the specific installation manual for a comprehensive list tailored to your fountain model․ Having everything prepared beforehand ensures a smooth and efficient installation process․
Safety Precautions During Installation
Prioritizing safety during Elkay fountain installation is paramount․ Always disconnect electrical power at the breaker before commencing any electrical work․ Verify the power is off with a voltage tester․ Wear appropriate personal protective equipment (PPE), including safety glasses and gloves․
Exercise caution when drilling or cutting into walls, ensuring no hidden pipes or wiring are present․ Be mindful of water lines; relieve water pressure before disconnecting any plumbing․ Properly ground electrical components to prevent shocks․
Lift heavy components with assistance to avoid strain or injury․ Follow all local plumbing and electrical codes diligently․ If unsure about any aspect of the installation, consult a qualified professional․
Refer to the Elkay installation manual for model-specific safety guidelines․ Ignoring these precautions could result in injury, property damage, or void the warranty․

Installation Steps: General Overview

Elkay installations generally involve site preparation, bracket mounting, water line connection, and electrical hookups (if applicable)․ Always consult the manual for specifics!
Step 1: Preparing the Installation Site
Before beginning, carefully assess the chosen location for your Elkay water fountain․ Ensure the surface is level and structurally sound to support the fountain’s weight, even when in use․ Verify accessibility for both installation and future maintenance, including filter replacements․
Crucially, confirm the proximity of both a potable water supply line and a suitable electrical outlet (if the model requires it)․ Check for compliance with all local plumbing and electrical codes․ Protect the surrounding area with drop cloths to prevent damage during installation․
Carefully inspect the area for any obstructions that might hinder the installation process, such as pipes or wiring within the wall․ If necessary, consult with a qualified professional to relocate these obstacles․ Proper site preparation is paramount for a successful and long-lasting installation, as detailed in the Elkay installation manual․
Remember to review the specific requirements outlined in your model’s manual before proceeding․
Step 2: Mounting the Fountain Bracket
Securely mounting the fountain bracket is critical for stability․ Using the provided hardware, carefully align the bracket with the pre-drilled holes on the wall – ensuring it’s level․ Consult the Elkay installation manual for specific bracket dimensions and mounting height recommendations based on your model․
Employ appropriate anchors for the wall type (concrete, drywall, etc․) to guarantee a robust hold․ Tighten the screws firmly, but avoid over-tightening, which could damage the wall or bracket․ Double-check the bracket’s levelness using a spirit level before proceeding․
For certain models, the manual may detail specific torque specifications for the mounting screws․ Adhering to these guidelines ensures a safe and reliable installation․ A properly mounted bracket forms the foundation for the entire fountain assembly, preventing wobbling or potential hazards․
Always prioritize a secure and level mounting for optimal performance․
Step 3: Connecting the Water Supply Line
Connecting the water supply line requires precision to prevent leaks․ First, shut off the main water supply․ Refer to the Elkay installation manual for the correct fitting size and type – typically ½” or ¾” NPT․ Apply Teflon tape to the male threads of the supply line connection to ensure a watertight seal․
Carefully attach the supply line to the fountain’s inlet, tightening with a wrench․ Avoid excessive force․ Next, slowly turn the main water supply back on, closely inspecting the connection for any signs of leakage․ If leaks are detected, immediately shut off the water and re-tighten the connection, or re-apply Teflon tape․
Some models may include a filter; ensure it’s installed correctly before connecting the supply line․ Compliance with local plumbing codes is essential; verify backflow prevention devices are in place as required․ A secure, leak-free connection is paramount for safe operation․
Step 4: Electrical Connection (If Applicable)
Electrical connection is crucial for models with features like chillers or bottle fillers․ Always disconnect the main power supply before commencing any electrical work․ Consult the Elkay installation manual for specific voltage and amperage requirements – typically 115V/60Hz․
Locate the designated electrical access panel on the fountain․ Connect the ground wire (green or bare copper) to the grounding screw․ Then, connect the neutral wire (white) and the hot wire (black) to the corresponding terminals, ensuring secure connections․ Double-check all wiring against the manual’s diagram․
Before restoring power, verify all connections are tight and properly insulated․ Once confirmed, cautiously restore power and test the fountain’s electrical functions․ Compliance with local electrical codes is mandatory; if unsure, consult a qualified electrician․ Improper wiring can pose a safety hazard․

Specific Model Installation: ezH2O Bottle Filling Station

ezH2O installation demands careful attention to unique components, following the Elkay manual for lower cooler setup and bottle filler connections, ensuring optimal functionality․
ezH2O: Unique Features and Considerations
The ezH2O Bottle Filling Station represents a significant advancement in hydration technology, offering features beyond traditional fountains․ Installation requires understanding these distinctions․ Key considerations include the integrated filtration system, demanding proper water supply connection for optimal purity․ The hygienic, touch-free operation necessitates careful electrical connections, if applicable, adhering strictly to the Elkay installation manual․
Unlike conventional models, the ezH2O boasts a bottle filler component, requiring specific bracket mounting and component alignment․ Installation must account for adequate space around the unit for bottle filling and user accessibility․ The digital display and sensor technology demand precise wiring and programming, as detailed in the manual․ Furthermore, the unit’s robust construction necessitates appropriate wall support to handle its weight․ Thoroughly reviewing the Elkay guidelines before commencing installation is crucial for a successful outcome, ensuring all unique features function as intended․

Installing the Lower Water Cooler
Installing the lower water cooler is a pivotal step, demanding precision as outlined in the Elkay installation manual․ Begin by securely mounting the fountain bracket, ensuring it can bear the cooler’s weight․ Carefully position the lower cooler onto the bracket, aligning it precisely with the pre-drilled holes․ Securely fasten the cooler using the provided hardware, tightening bolts to the manufacturer’s specified torque to prevent loosening․
Prior to connecting the water supply, inspect the cooler’s inlet for any debris․ Connect the water line, utilizing appropriate fittings and sealant to prevent leaks․ Refer to the manual for specific plumbing requirements and code compliance․ Once connected, slowly introduce water to the system, meticulously checking for any signs of leakage around the connections․ Installation should only proceed after confirming a watertight seal․ Remember to install only the lower cooler at this stage, following the manual’s sequence․
Connecting the Bottle Filler Components
Connecting the bottle filler components requires careful adherence to the Elkay ezH2O installation manual․ Begin by attaching the bottle filler nozzle assembly to the designated port on the water cooler, ensuring a secure and watertight connection․ Next, connect the push-button activation mechanism, verifying proper alignment and functionality as detailed in the manual․
Pay close attention to the routing of any electrical wiring for illuminated features or sensors, following the manual’s diagrams precisely․ Securely fasten all wiring harnesses to prevent strain or damage․ Once all components are connected, conduct a thorough visual inspection to confirm all connections are tight and secure․ The manual emphasizes the importance of proper grounding for electrical safety․ Finally, refer to the installation guide for specific torque specifications for all fasteners to ensure optimal performance and prevent leaks․
Testing the ezH2O Functionality
Testing the ezH2O after installation, as outlined in the Elkay manual, is crucial․ First, activate the bottle filler and verify a consistent, clean water flow․ Check for any leaks around the nozzle and connections, tightening as needed․ Next, test the hands-free sensor activation, ensuring it reliably triggers the water flow․ The manual details expected flow rates for optimal performance;
Observe the filter status indicator; it should accurately reflect the filter’s condition․ Cycle through the different fill height options, if applicable, to confirm proper operation․ Finally, test the unit’s electrical components, such as the LED illumination, if equipped; Refer to the Elkay installation manual for troubleshooting tips if any issues arise during testing․ A successful test confirms a properly installed and functioning ezH2O bottle filling station․
Installation: Traditional Drinking Fountain Models
Traditional fountain installation involves careful basin shroud assembly, referencing the Elkay manual for proper alignment and secure attachment, ensuring a polished finish․
Follow manual instructions for lower cooler installation and verify plumbing code compliance throughout the process for a safe, functional setup․
Traditional Fountain: Basin Shroud Assembly
Initiating the basin shroud assembly for traditional Elkay drinking fountains requires a delicate touch and strict adherence to the installation manual; Begin by carefully lifting the basin shroud, tilting it forward towards the front of the water cooler unit․ This maneuver provides access to the internal components and facilitates a secure fit․
Ensure the shroud’s alignment with the mounting bracket is precise before gently lowering it into position․ The manual often details specific notch or tab locations that must interlock correctly․ Secure the shroud using the designated fasteners – typically screws – tightening them evenly to avoid stress fractures or misalignment․
Pay close attention to any gaskets or seals included with the shroud; these are crucial for preventing leaks and maintaining sanitary conditions․ Refer to the Elkay manual’s diagrams for proper gasket placement․ A correctly assembled basin shroud not only enhances the fountain’s aesthetic appeal but also contributes to its overall structural integrity and hygienic operation․
Always double-check all connections before proceeding to the next installation step․
Installing the Lower Water Cooler (Traditional)
The installation of the lower water cooler, as detailed in the Elkay manual, is a critical step in the traditional fountain setup․ Begin by carefully positioning the cooler onto the previously mounted bracket, ensuring it sits flush and securely․ The manual will specify the correct orientation and alignment for optimal performance․
Connect the water supply line to the designated inlet on the lower cooler, utilizing appropriate fittings and tightening them firmly to prevent leaks․ It’s vital to adhere to plumbing code compliance during this stage․ Following the manual’s guidance, secure the cooler to the bracket using the provided hardware, ensuring a stable and vibration-free installation․
Before proceeding, double-check all connections for tightness and proper alignment․ The Elkay installation manual emphasizes the importance of a secure lower cooler foundation for the fountain’s long-term reliability and hygienic operation․ Install only at this time onto bracket as per rough-in dimensions․
Proceed with caution and refer to diagrams for clarity․
Checking for Plumbing Code Compliance
Ensuring adherence to local plumbing codes is paramount during Elkay fountain installation․ The installation manual repeatedly stresses the necessity of verifying compliance with all applicable regulations before, during, and after the process․ This includes backflow prevention requirements, water hammer arrestors, and proper drainage considerations․
Specifically, check for stipulations regarding the type of piping materials permitted, the required air gap between the fountain’s water outlet and the drain, and any local mandates for lead-free components․ The Elkay manual often references relevant industry standards and directs installers to consult with local authorities for clarification․
Your installation must meet all codes․ Failure to comply can result in fines, mandatory modifications, or even the removal of the fountain․ CHECK your installation for compliance with plumbing, electrical, and other applicable codes․ Thorough documentation of code compliance is also recommended for future inspections․
Prioritize safety and legality throughout the installation․
Post-Installation Procedures
Final inspection, leak testing, and leaving instructions with the fountain are crucial․ Regular maintenance and filter replacement ensure continued clean water access․
Troubleshooting guides within the manual address common issues․
Final Inspection and Leak Testing
Following installation, a thorough inspection is paramount․ Begin by visually confirming all connections – water supply lines, drain lines, and electrical components (if applicable) – are securely fastened and properly aligned, referencing the Elkay installation manual for specific diagrams․
Next, carefully operate the fountain, activating both the drinking water stream and the bottle filler (if equipped)․ Observe all connections for any signs of leakage․ Pay close attention to the areas where the water supply line connects to the fountain, around the drain, and at any joints in the plumbing․
Leak testing should involve running the fountain continuously for at least fifteen minutes, checking periodically for drips or moisture․ If leaks are detected, immediately shut off the water supply and tighten the connections․ If tightening doesn’t resolve the issue, disassemble the connection, inspect for damaged components (like washers or O-rings), and replace them as needed․
Ensure the basin shroud is correctly installed and securely fastened, preventing water from splashing onto surrounding surfaces; Finally, verify the fountain operates smoothly and delivers a consistent stream of cool, filtered water․ A successful final inspection guarantees a safe and reliable hydration station․
Leaving Instructions with the Fountain
Crucially, after completing the Elkay water fountain installation, it’s essential to leave the installation manual and any relevant documentation securely with the fountain itself․ This ensures future maintenance personnel or facility staff have immediate access to vital information regarding the unit’s operation and upkeep․
The manual contains detailed diagrams, troubleshooting guides, and parts lists, proving invaluable for filter replacements, minor repairs, and understanding the fountain’s specific features․ Include any warranty information or contact details for Elkay customer support․
Consider creating a laminated quick-start guide summarizing essential maintenance tasks, such as filter replacement frequency and basic cleaning procedures․ This is particularly helpful for non-technical staff․ Clearly label the location of the manual and any supplemental instructions for easy access․

Providing these resources empowers users to maintain the fountain’s optimal performance and longevity, minimizing downtime and ensuring continued access to clean, safe drinking water․ Proper documentation is a key component of responsible installation․
Maintenance and Filter Replacement
Regular maintenance is vital for ensuring the continued delivery of clean and safe drinking water from your Elkay fountain․ The installation manual details a schedule for filter replacement, typically every six to twelve months, depending on water quality and usage․ Utilize only genuine Elkay replacement filters to maintain performance and warranty validity․

Periodic cleaning of the basin, nozzle, and surrounding areas is also crucial․ Use mild soap and water, avoiding abrasive cleaners that could damage the finish․ Inspect the fountain regularly for leaks or signs of wear and tear, addressing any issues promptly․
The manual provides step-by-step instructions for filter replacement, including diagrams illustrating the process․ Remember to flush the fountain after each filter change to remove any residual carbon particles․ Proper maintenance extends the fountain’s lifespan and safeguards public health․
Adhering to the recommended maintenance schedule, as outlined in the manual, guarantees optimal functionality and consistent water quality for years to come․
Troubleshooting Common Installation Issues
The Elkay installation manual anticipates potential challenges during setup․ Common issues include leaks at connection points, often resolved by tightening fittings or applying plumber’s tape․ Electrical connection problems, if applicable, should be addressed by a qualified electrician, referencing the manual’s wiring diagrams․
If the fountain doesn’t operate after installation, verify the water supply is turned on and the electrical circuit is active․ Check for any obstructions in the water line or filter housing․ For ezH2O models, ensure all bottle filler components are correctly connected․

The manual provides detailed diagrams and troubleshooting steps for various scenarios․ If issues persist, consult a qualified plumber or electrician․ Remember to always disconnect power before attempting any electrical repairs․
Carefully reviewing the manual’s troubleshooting section can save time and prevent costly service calls, ensuring a smooth and successful installation process․
Elkay Water Fountain Installation Manual Location
Locating the Elkay water fountain installation manual is crucial for a successful setup․ Typically, a physical copy is included within the packaging of the fountain itself, often secured to the unit or nestled amongst the protective materials․ However, should the physical manual be misplaced, Elkay provides readily accessible digital versions․
The official Elkay website (www․elkayusa․com) hosts a comprehensive library of manuals, searchable by model number․ You can find the correct manual by entering the specific model number located on the fountain’s nameplate․ Online tutorials, like those available on platforms like YouTube, also often reference and visually guide users through the manual’s instructions․
Furthermore, many plumbing supply retailers that sell Elkay products also provide links to downloadable manuals on their websites․ Keeping a digital copy readily available ensures easy access for future maintenance or troubleshooting needs․
Recent School Installations with Elkay Fountains
Recent initiatives demonstrate a growing commitment to student hydration and health through Elkay fountain installations in schools nationwide․ Delta Dental of Idaho spearheaded a project, installing new Elkay water fountains and bottle-filling stations across twelve Idaho schools, enhancing access to clean drinking water․
Eries Public Schools (EPS) is undertaking a significant upgrade, planning to install fifty donated Elkay filtered bottle filling stations in nine elementary schools․ This project extends to the district’s Culinary Center, where all faucets will be converted, ensuring filtered water availability throughout the facility․
Milwaukee Public Schools (MPS) is receiving a substantial boost with 700 new Elkay units, supported by a $2․2 million donation from Zurn Elkay, alongside the city’s commitment to safer water․ These installations reflect a broader trend of prioritizing student well-being and access to hygienic hydration solutions․










